Type | Public (PSE: FPH) |
---|---|
Industry | Power, manufacturing, property |
Founded | June 30, 1961 |
Headquarters | Pasig City, Philippines |
Key people | Federico Rufino Lopez Chairman and CEO Oscar M. Lopez, Chairman Emeritus and Former CEO Elpidio L. Ibanez, President |
Revenue | US$ 1.78 billion (2008) |
Operating income | US$ 400 million (2008) |
Net income | US$ 560 million (2008) |
Total assets | US$ 5.15 billion (2008) |
Total equity | US$ 1.57 billion (2008) |
Employees | 86 |
Subsidiaries |
Manila Electric Company |
Website | fphc.com |
First Philippine Holdings Corporation (First Holdings) is a holding company whose core business is power generation and distribution with strategic investments in manufacturing and property. First Holdings is a member of the Lopez Group of Companies.
Its power generation subsidiary, First Gen Corporation, is now the largest vertically integrated power generation company in the Philippines with an installed capacity of 2, 582 megawatts (MW). Its power distribution associate, Manila Electric Company (Meralco),the largest power distribution company in the country, operates in a franchise area of 9,337 km2. This franchise area covers 25 cities and 86 municipalities including Metro Manila, the entire provinces of Bulacan, Rizal and Cavite; parts of the provinces of Laguna, Quezon and Batangas; and 17 barangays in Pampanga. Meralco's franchise area produces 49 percent of the country's gross domestic product, with 32 percent in Metro Manila alone.
First Philippine Electric Corporation (First Philec) is the holding company for all of its manufacturing businesses such as dry-type transformers and silicon wafer-slicing. First Philippine Industrial Park (FPIP) is the only Integrated Management System certified industrial park in the Philippines while Rockwell Land Corporation (Rockwell) is the first property firm in the country to develop a complete, high-end, inner-city community.
First Holdings maintains its corporate headquarters at the 4th floor of the Benpres Building in Ortigas Center at Pasig City, Philippines.
Contents |
In the 1950s, then-President Carlos Garcia pushed for a larger Filipino role in the nation's economic activities. Indeed, the next decade witnessed the flowering of Filipino entrepreneurial spirit. Among the many Filipino entrepreneurs whose businesses flourished in this period was Don Eugenio Lopez Sr. (Don Eugenio), an entrepreneurial and visionary businessman who would soon establish a conglomerate that would become First Philippine Holdings Corporation.
Lopez graduated from the Ateneo de Manila University in 1919, with an AB Degree, Cum Laude. He went on to study law in the University of the Philippines and after passing the bar exams, he underwent a year of post graduate studies in law at Harvard University.
Lopez had various businesses. In 1932, he established the Iloilo Negros Air Express Company. He also made his mark in sugar milling, with the acquisition of the Binalbagan-Isabela Sugar Company (BISCOM). He was a power in media, owning The Manila Chronicle newspaper and ABS-CBN Broadcasting Corporation, the Philippines' largest media conglomerate. He was also one of the founders of the Philippine Commercial and Industrial Bank (PCI Bank).
But in 1962, he bought the biggest company in the Philippines, Meralco.
1961 | On June 30, Don Eugenio and other leading businessmen form Meralco Securities Corporation (MSC), the forerunner of First Philippine Holdings Corp. MSC was the corporate vehicle that acquired the Manila Electric Company from its American owners. | |
1966 | In October, MSC puts up a business development group headed by Oscar M. Lopez to guide an expansion and diversification program. | |
1967 | In March, MSC organizes the ,Meralco Securities Industrial Corp. to build pipelines carrying petroleum products from Batangas to Metro Manila. Also, MSC begins to acquire a controlling stake in PCIBank. | |
1969 | MSC establishes the Engineering and Construction Corporation of Asia (ECCO-Asia), a construction company. It receives the electromechanical contract to build the Bataan Nuclear Power Plant and other NAPOCOR contracts. | |
1970 | MSC completes the payment for Meralco several months ahead of schedule. In October, it inaugurates the Philec plant in Taytay, Rizal. | |
1972 | On September 22, President Ferdinand Marcos declares martial law. | |
1973 | On November 29, Don Eugenio is forced to hand over his controlling stake in MSC and Meralco to the dictatorship. | |
1975 | Don Eugenio dies of cancer in San Francisco, California on July 6. Meralco agrees to the eventual sale of its transmission lines and major plants. | |
1977 | MSC is renamed First Philippine Holdings Corporation. | |
1983 | Benigno Aquino Jr. is assassinated upon his arrival in the Philippines. The country plunges into deep economic and political turmoil. | |
1986 | The EDSA 1 Revolution topples the Marcos regime. In April, Oscar M. Lopez assumes the presidency of First Holdings. During this period, the company undertook the process of regaining its Meralco shares. | |
1987 | The company begins the long and tedious process of recovering a portion of its Meralco stake and the settlement of its debt to the Development Bank of the Philippines. | |
1989 | The power crisis begins to be felt. First Holdings goes into power generation in response to the crisis. | |
1990 | Sandiganbayan opposes mechanism of First Holdings, Benpres, MFI and Malacanang for the privatization of Meralco. First Holdings files a motion with the Supreme Court to overturn the Sandiganbayan decision. | |
1991 | On November 24, First Holdings creates First Gas Power Corp. to generate power through natural gas. First Holdings allies with Shell, Siemens and others to build a power plant in Batangas. | |
1994 | On November 24, First Holdings creates First Gas Power Corp. to generate power through natural gas. First Holdings allies with Shell, Siemens and others to build a power plant in Batangas. The Bauang power plant is inaugurated a year later. | |
1997 | First Holdings opens the First Sumiden plant in Laguna, a joint venture with Sumitomo. In November, it forms First Philippine Balfour Beatty with Balfour Beatty. | |
1998 | First Holdings goes into toll roads with Manila North Tollways. | |
2001 | Oscar Lopez is awarded "Management Man of the year by the MAP for turning around First Holdings. The company also marks its 40th year of service on June 30 and consolidates its power generation assets in First Gen. | |
2002 | First Holdings becomes the first Filipino holding company to be certified against the ISO 9001:2000 standard. It takes the lead in mobilizing funds for the NLEX project and increases its stake in FPIDC. | |
2003 | San Lorenzo gas-fired plant completes its first full year of commercial operations and First Gen sells its equity in Panay Power Corporation. | |
2004 | First Holdings is cited in Asia Money magazine's Best Companies Poll for the Philippine small market capitalization category. | |
2005 | MNTC starts commercial operations of the NLEX. | |
2006 | First Gen goes public. | |
2007 | First Holdings earns its highest revenues and net income in its 47-year history. Its revenues hit an all-time high of P59.6 billion while its net income was P8.7 billion. | |
2008 | The Government Service Insurance System sells Meralco and agrees to share its 27% stake to food and beverage conglomerate San Miguel Corporation at an estimated amount of P27 billion. | |
2009 | First Holdings sells 20% of its ownership in Meralco to PLDT. The company also received an Integrated Management Systems (IMS) Certification and a gold award in the 2008 Corporate Governance Scorecard. | |
Meralco was so large that many Filipino businessmen believed that its acquisition by a Filipino was nearly impossible. By 1960, Meralco was worth $66 million and served more than 360,000 customers. In 1961, Fortune Magazine cited that the company's operations and equipment were comparable to the best US power firms.
But although Meralco was a stable and highly profitable enterprise, the government's decree of pushing for more Filipino participation in the business prodded General Public Utilities (GPU) president Albert F. Tegen, to find a buyer for the company. Tegen approached a number of the leaders in the Manila's business community, including the Araneta-Zobel group, which balked at buying only 5% of the company.
Eventually the key people involved in the buyout of the company – Tegen and Roberto T. Villanueva, BISCOM's Chairman of the Board, crossed paths in New York. Villanueva was pursuing the owners of Victorias Milling Company, a Negros-based sugar company, to make an offer for their firm. However, the owners remained unwilling to sell.
Knowing that Villanueva was instrumental in the successful Filipino buyout of several companies, Tegen asked him to explore the possibility of the Lopez Group buying Meralco.
Even Lopez knew how risky the Meralco deal would be, for none of his previous business acquisitions amounted to its sale price. Buying Meralco and running it well required tremendous capital, managerial talent, and personal focus. But Don Eugenio was a visionary - he recognized the opportunities in the power industry.
Two syndicate of banks were established to handle this big transaction - one was a US Bank headed by Citibank and another local bank headed by PCI Bank. The Lopez Group paid a 10% down payment and the balance was paid over a 10-year period.
So on June 8, 1961 Tegen and Villanueva signed a preliminary agreement between GPU and the Lopez Group. Lopez needed a new corporate entity to take over the Meralco assets. Two days after, Meralco Securities Corporation (MSC) was established. It was principally organized to acquire ownership of the Manila Electric Company and manage its business. In the years that followed, MSC went beyond being an acquisition and management tool for Meralco – it also became an important company in its own right.
Initially, its capital stock was at Php 450M and the number of initial stakeholders was 605. Its 14 initial incorporators comprised some of the brightest businessmen at that time: Rafael Anton, Salvador Araneta, Antonio Delgado, Senen Gabaldon, Emilio Gonzales La'O, Ricardo Ledesma, Eugenio Lopez, Eugenio Lopez, Jr. (Geny), Alfredo Montelibano, Ernesto Oppen, Jr., Ernesto Rufino, Sr., Jose Soriano, Dolores De Tuazon, and Roberto Villanueva.
For the first few years, MSC had no independent life; its fate was tied to the success of Meralco. Because it was primarily focused on acquiring Meralco, it was virtually unknown. But after 1966, MSC's time to shine came.
Up to 1962, Meralco was greatly dependent on the National Power Corporation (NAPOCOR) for 35% of its power requirements. While NAPOCOR had a program for expansion, the program was delayed and it took them more than two years to put up a power plant. It built a new power plant every 18 months, and expanded its generating capacity fivefold, from 300,000 kW to 1.5 million kW in 10 years. At this time, Meralco's rates were among the lowest in the world.
MSC's management had two main goals in mind: to pay for the buy out of Meralco and run it far better than it had been before. Lopez recruited Filipino managers, such as Meralco Chief Finance Officer Vicente Paterno, Antonio Ozaeta and Christian Monsod, while retaining some of the American managers like Lee Garner, Russ Swartley and Steve Psinakis. Eventually, most of these managers headed various local and multinational corporations.
By 1966, its initial financial pressures were beginning to ease. Paterno's success in tapping new funds from international capital markets freed the company from major financial worries for at least the next four years. In late 1966, Meralco shareholders received dividends for the first time. In the same year, Don Eugenio created a Department of Economic Research and Development headed by his son, Oscar M. Lopez. Together with Ernesto "Ernest" Rufino, Jr., Oscar sought to make MSC as broad as possible. Their efforts focused on the following areas: expanding the Meralco franchise area, computer services, construction, banking, and financial services.
Oscar and Ernest saw the need to bring fuel from Batangas to Sucat in the cheapest possible way. As a result, MSC created the first commercial pipeline in the country. The pipeline transported bunker oil to Meralco power plants. Even oil companies such as Pilipinas Shell and Caltex needed to transport white oil products more efficiently from Batangas to other oil depots, as they were still using barges and trucks. Thus, two pipelines were created. One transported black oil products which included bunker fuel and crude oil, and the other ferried white oil products such as gasoline, diesel, and LPG. This new company, called Meralco Securities Industrial Corporation, was created on March 31, 1967. It was later renamed as First Philippine Industrial Corporation (FPIC).
Aside from the pipeline industry, MSC created Philec and many other subsidiaries.
But during the term of then-President Ferdinand Marcos in 1970, the Philippines was confronted with its worst economic crisis which stemmed from economic mismanagement, affected the government's ballooning debt, the peso devaluation, and other factors. The crisis lasted for 25 years and Meralco, the cornerstone of the MSC conglomerate, was the hardest hit. The annual increase in electricity demand was anemic while the company's net income dropped from Php 62.2M in 1969 to Php 10.3M in 1971.
It was not only the financial crisis that challenged Meralco. At that time, the Philippines was also plunging deeper into a political crisis. While Philippine society was modernizing and becoming more diverse, politics was becoming increasingly polarized between the conservative elite and emergent forces calling for political, social, and economic change.
Public discontent with the administration grew from alleged issues of corruption and human rights violation. Consecutive protests took place – showing the Filipinos' grievances over the social injustices they were witnessing. This was what later became known as the First Quarter Storm.
On September 21, 1972, President Ferdinand Marcos issued Proclamation No. 1081, placing the entire country under martial law. Along with this, he also issued Letter of Instruction 2 which instructed the military to take over all public utilities such as Philippine Long Distance Telephone Company and Meralco. And shortly after the midnight of September 22, elements of the 51st Army Engineering Brigade entered the Meralco compound and took over the power company.
The Marcos regime used various tactics to force Don Eugenio to hand over his controlling stake in MSC and Meralco to the dictator and his cronies. Two of which included a government-imposed cut in power rates and the imprisonment of Geny, his eldest son, on trumped-up charges.
Under duress and with fear of not seeing his son Geny set free, Don Eugenio was forced to sign an agreement on November 29, 1973, ceding ownership of MSC to Benjamin "Kokoy" Romualdez, brother of First Lady Imelda Marcos and an alleged Marcos bagman. Despite this, Marcos reneged on his promise to set Geny free even until Don Eugenio's death on July 6, 1975 in San Francisco, USA.
In 1978, MSC was renamed First Philippine Holdings Corporation. First Holdings went on a huge expansion program, which included the acquisition of 25% of Pilipinas Shell. First Holdings also organized another wholly owned subsidiary, First Holdings International (FHI), to coordinate the overseas activities of Engineering and Construction Corporation of Asia and the Pacific Engineering Company, Inc. The establishment of FHI positioned the company for expanding its contracting and project management services abroad, particularly in the Middle East, which was then regarded as the primary source of profitable undertakings.
But the magnitude of its investments and the unfavorable conditions in the financial market, led to the near-collapse of First Holdings by the mid-1980s. The country was experiencing a prolonged recession in the second half of 1983. The country's fall-out resulting from the assassination of Senator Benigno S. Aquino spared no one. Massive capital flight of international investors immediately followed. Almost overnight, credit from both foreign and local sources dried up. Forcing bankruptcy, management of corporate debt became a major concern of the company. To eliminate its debt, First Holdings sold its equity in Pilipinas Shell Petroleum Corporation while First Holdings Center in Makati was sold to a group of banks.
Amidst divestment of assets and scaled down activities, the company suffered years of consolidated net losses. In 1985, this situation was further aggravated with the termination of its sub-contract for the Hail electrification project in Saudi Arabia.
With the national economy in ruins and failure of the electoral process, calls for reform were coming from the local and foreign community. President Marcos was hounded by pressure from many sides – an increasingly restive people, a rapidly failing economy, growing doubts by foreign creditors, a hostile international press, and unbridled corruption of his closest allies.
With the economy in ruins and increasing pressure, both internal and external, Marcos called for "snap" elections. What was once an unruly and fractious opposition came together in time to put up one presidential candidate, Corazon "Cory" Aquino, widow of Ninoy. The election took place with international media representatives and invited observers of foreign governments covering the event. Many Filipinos volunteered as poll watchers – guarding the ballot boxes with their life. Such courage, however, did not prevent the widespread fraud and terrorism which caused the failure of the electoral process.
Subsequently, members of the military, led by the Minister of National Defense and the Vice Chief of Staff of the Armed Forces broke with President Marcos and announced their support for Corazon Aquino, whom they regarded as the duly elected president of the Philippines. Filipinos from all walks of life gathered together – giving birth to the historic EDSA revolution. The dark days of dictatorship had ended and democracy was reborn. For First Holdings, these turn of events eventually made its rehabilitation possible.
After the EDSA Revolution, the Lopezes regained control of First Holdings. Oscar Lopez took the helm of a battered company, which was nearly bankrupt with over Php 1.2 billion in debt.
But it was not only the parent company which needed rehabilitation. Even its subsidiaries had to get moving. There were two principle tasks which had to be done: generating more cash flow and a respectable rate of return for the stockholders. Both of these turned out to be considerable challenges, but the people in First Holdings took them one step at a time - and they prevailed.
After one year, the company was able to reschedule and rearrange most of its debt load by selling some assets. It also began the long process of reacquiring part of its stake in Meralco. And in 1990, the company made its first profit since 1983 of Php 28 million.
In 1992, First Holdings re-entered the power generation business through the building of a 225 MW diesel plant under Bauang Private Power Corporation (Bauang Power). At that time, Bauang Power held several distinctions: it was the only predominantly Filipino-owned fast track power plant in the country to offer the cheapest power among many fast track plants, the largest medium-diesel plant in the world, and the fastest commissioning for a plant of its type in the world.
It diversified into more businesses and opened new plants. The company took part in developing the Malampaya Project, the largest and most significant industrial investment in the history of the Philippines which signals the birth of the country's natural gas industry. In partnership with British Gas plc, First Holdings created First Gas Corporation Holdings to build and run the first gas-fired combined-cycle gas turbine power plants in the country. Under First Gas are the 1,000 MW Sta. Rita and 500 MW San Lorenzo power plants, both located in Batangas.
This decade also marked the company's entry into infrastructure with the development of the North Luzon Expressway (NLEX), an 84-kilometer world-class highway – the longest toll road in the country in terms of lane-kilometers.
Responding to the government's call for a private sector to invest in the NLEX project, the Lopez Group took up the challenge of mobilizing funds and mustering managerial expertise.
In 1994, the First Philippine Infrastructure Development Corporation (FPIDC) was formed to enter into partnership with the Philippine National Construction Corporation for the NLEX project. FPIDC incorporated the Manila North Tollways Corporation (MNTC) in February 1997 as the operating company for the NLEX project. The other stockholders are EGIS Projects S.A. of France, Leighton Contractors Asia Limited of the publicly listed Australia Exchange, and the Leighton Group of Australia.
First Holdings has gained recognition for the substantial investments it made in industrial parks, property development, and manufacturing. In 2001, the MNTC financing structure was recognized as the "Asia-Pacific Transport Deal of the Year 2001" by the Project Finance magazine, published by the Euromoney of London. Indeed, the NLEX project took pride in its being the first project financed toll road undertaking in the country and also the first project to achieve financial close outside the power sector despite the global economic crisis.
The company also won the bid for the Subic-Clark-Tarlac Expressway (SCTEX) in 2007. SCTEX links three prime economic zones in Central Luzon: Subic Bay Freeport and Special Economic Zone, Clark Special Economic Zone, and Central Techno Park.
However, in 2008, First Holdings sold its toll road business to Metro Pacific Investment Corporation, a company with interests in real estate, utilities, and shipping.
In November 2006, First Gen won the bid to acquire the 112 MW Pantabangan-Masiway hydroelectric power plant complex from the Power Sector Assets & Liabilities Management. The following year, First Gen acquired a 60% economic interest in Philippine National Oil Company – Energy Development Corporation (EDC). EDC was established in 1976, to wean the country from its dependence on imported fuels by developing renewable sources of energy. It is an acknowledged global leader in wet steam field technology and is primarily engaged in the exploration, development, and optimization of geothermal fields.
Also, in 2008, the first large-scale silicon wafer-slicing plant was inaugurated in the Philippines – First Philec Solar Corp. This subsidiary, a joint venture between First Holdings and the Sunpower of the United States, aims to develop the solar energy industry in the Philippines and to compete with companies providing wafer-slicing services in China, Japan, and Germany.
The Philippines was not spared from the global financial crunch of 2008, and so was First Holdings. While the company enjoyed a favorable business climate in the past years, it was affected with the economic crisis. Currency movements, high finance costs, and other factors caused First Holdings to sell 20 percent of its ownership in Meralco to Philippine Long Distance Telephone Company (PLDT).
In spite of the challenging year, First Holdings and its subsidiaries reaped a number of achievements from various groups. The parent company received an Integrated Management Systems (IMS) certification for its adherence to quality standards and a gold award for corporate governance.
First Gas Power Corporation also won the 2008 "Asia Pacific Refinancing Deal of the Year" award from ProjectFinance magazine. The company earned its award for its successful completion of a US$544-million refinancing agreement with nine large foreign banks. According to ProjectFinance Magazine, the deal was a "major achievement" because it was finalized "at a time when lack of liquidity, a spike in labor rates and unwillingness to lend long term had frozen the debt market"
First Holdings' strategic vision is anchored on the values which have been passed on from Don Eugenio to the current Lopez generation.
More so, Oscar believed that the success of the Lopez family and their companies owed more to the intangibles of management: values, vision, and leadership. They have ingrained corporate values that go beyond the mere earning of profits. These core values have sustained them through the many difficult times of the past.
First Holdings' commitment to its stockholders is also reflected in its commitment to its employees. Its employees have compensations and benefits considered among the best in the Philippines. Frequent training and career development programs raise levels of competence, develop positive work values, and prepare employees for productive careers. First Holdings' management consists of a talented and committed management team – people of experience and vision who are instrumental to the success of the company. To further hone and expand their capabilities, First Holdings sends its managers to attend post-graduate programs and courses at the Asian Institute of Management as well as other educational institutions.
Don Eugenio believed that a company's greatest asset was its people, and that they should be nurtured accordingly. He was known for his fairness and generosity to its employees. This principle is seconded by Oscar who also believes that a company is only as strong as its people.
First Holdings claims that the total compensation of their employees is over and above industry standards and considered as one of the best benefit packages in the country. Apart from this, employees are empowered to make decisions within their sphere of influence. The employees' personal and professional development are nurtured through the Training & Development opportunities like the Executive Masters in Business Administration and the managerial leadership programs of the Asian Institute of Management are offered and open to its employees.
Each of First Holdings' subsidiaries has its own Human Resources departments and systems, but the parent company handles the talent management of the executives who are deployed in various subsidiaries as seconded employees.
The HR departments of the First Holdings Group are part of the Lopez Group HR Council, where they discuss and exchange their best practices in the group.
First Holdings uses the Malcolm Baldrige Criteria to cover both its corporate initiatives and corporate social responsibility.
First Holdings was among eight companies that received a gold award[1] (a rating between 95 to 99%) for garnering the highest ratings, among 169 publicly listed companies, in the 2008 Corporate Governance Scorecard Project (CG-Sc), conducted by the Institute of Corporate Directors (ICD), Philippine Stock Exchange and Securities and Exchange Commission.
First Holdings has adopted a manual on Corporate Governance, Corporate Code of Conduct, and Manual on Anti-Money Laundering.
The company's corporate governance has been entrusted to the board of directors. To ensure that independent, objective, and reasoned views are part of its board deliberations, First Holdings has more than what the law mandates of having at least 2 independent directors or at least 20 percent of a company's board membership. To date, the company has five existing independent directors.
In 2009, First Holdings marked two milestones in the company's corporate history.
First, it achieved triple certification when it successfully passed the audits for the ISO 9001, 14001, and OHSAS 18001 standards. It is the only holding company in the Philippines to receive an IMS certification from Certification International.
Second, it received a gold award from the ICD for its commitment to good corporate governance. First Holdings was among only eight companies who received a gold award (a rating between 95 to 99%) for garnering the highest ratings, among 169 publicly listed companies, in the 2008 CG-Sc, jointly conducted by the ICD, Philippine Stock Exchange and Securities and Exchange Commission.
The corporate initiatives also include standards based systems, management tools, and recognition awards. Part of its management tools include the environment, safety, and health programs (ESH) and the Six Sigma program. The prominent standards systems in use are ISO 9001, ISO 14001 and OHSAS 18001.
Meanwhile, ESH started in 1998 as a corporate initiative for companies in the First Holdings Group which was eventually rolled out for the whole Lopez Group.
Even before the term corporate social responsibility began to be used in the Philippines, it had long been practiced by the Lopez Group of companies, like First Holdings. Don Eugenio called for his businesses to continually contribute to the betterment of society.
He even believed that a commercial firm which gives service and real satisfaction to the community, may be more successful than a multi-million corporation which reaps huge profits and then keeps them to itself.
The company's social responsibility programs provide employees with opportunities to help the general public and fulfill their individual interests to be of value to the society. They are inspired to give their time, energy, and resources to help. In this manner, employees are brought together to carry out regular activities to build stronger and closer relations with its local community.
Oscar Lopez also believes that a substantial proportion of the company's earnings should be returned to the people in form of foundations, grants, scholarships, hospitals, and many other forms of social benefits. His concern for the environment found concrete expression in the creation of First Philippine Conservation Inc. (FPCI), which supports the work of Conservation International (CI) in protecting Philippine biodiversity.
Today, FPCI works to protect the country's largest remaining block of old-growth rain forest in Sierra Madre range and currently implements the Verde Passage Integrated Conservation and Development in partnership with the CI and First Gas Corp.
Oscar's longstanding concern for eye care led him to create the Asian Eye Institute, a world-class eye care center in Rockwell and donate a mobile eye clinic to the Ophthalmological Foundation of the Philippines.
First Holdings also aggressively supports a corporate-wide Lifelong Wellness system that holistically develops employees' body, mind and spirit.
Oscar M. Lopez has enunciated a policy making employee wellness a priority. An Executive Recharging and Training Program was developed in 1998 and evolved into Corporate Wellness program which is now known as Lopez Lifelong Wellness (LLW).
LLW's goal is to help employees and their families develop a healthy lifestyle that, through voluntary behavioral changes, reduces health risks and maximizes the employee's potential. LLW activities include an annual three-day wellness seminar for all employees, learning sessions, fitness exercises and team-building activities.
First Holdings has core investments in power generation and distribution, as well as infrastructure, with strategic investments in manufacturing and property.
First Holdings, through First Gen Corporation, has investments in gas-fired, bunker-fired, hydroelectric and geothermal power generation plants.
First Holdings has core investments in power distribution through Manila Electric Company and Panay Electric Company.
First Holdings has investments in infrastructure. First Philippine Industrial Corporation is First Holdings' subsidiary engaged in pipeline services. Another subsidiary, First Balfour, Inc., is a construction company.
First Holdings has strategic investments in manufacturing under First Philec Corporation.
Under First Philec, the Electricals Division support electric utilities and comprises Philippine Electric Corporation, First Electro Dynamics Corporation, and First Philippine Power Systems, Inc. The Electronics Division, through First Sumiden Circuits, First Philec Solar Corporation, and First Sumiden Realty, continues to provide much-needed employment and foreign exchange.
First Holdings has strategic investments in property through Rockwell Land Corporation and First Philippine Industrial Park.
Rockwell Land Corporation is a real estate development company initially tasked to develop Rockwell Center, a 15.5 hectare prime residential and commercial property located in Makati City near the Central Business District.
The Rockwell Center used to be the site of the Meralco-owned 130 MW Rockwell Thermal plant named after James Chapman Rockwell, Meralco's 2nd and 4th president.
FPIP is a 315-hectare, modern industrial estate. It caters to wide range of industries such as light and medium manufacturing for export as well as the domestic market, high technology and non-pollutive industries and IT.
|
|